Altair Engineering Property, Plant, and Equipment 2016-2024 | ALTR

Altair Engineering property, plant, and equipment for the quarter ending September 30, 2024 was $0.038B, a 1.65% decline year-over-year.

  • Altair Engineering property, plant, and equipment for 2023 was $0.04B, a 6.09% increase from 2022.
  • Altair Engineering property, plant, and equipment for 2022 was $0.038B, a 7.32% decline from 2021.
  • Altair Engineering property, plant, and equipment for 2021 was $0.04B, a 11.41% increase from 2020.

Altair Engineering Property, Plant, and Equipment 2016-2024 | ALTR

  • Altair Engineering property, plant, and equipment for 2023 was $0.04B, a 6.09% increase from 2022.
  • Altair Engineering property, plant, and equipment for 2022 was $0.038B, a 7.32% decline from 2021.
  • Altair Engineering property, plant, and equipment for 2021 was $0.04B, a 11.41% increase from 2020.